Monschau-Höfen, Germany

In the course of this customer project, five Enercon E-115 wind turbines were equipped with an eologix:restart system. The aim was to minimise downtimes with the help of the system, which measures directly on the blade surface – Dipl.-Ing. Fotios Chitzios, Technical Operations Manager at STAWAG Energie GmbH gives an insight into the project.